Modern Marble

Factories

3 factories with area = 77,000 m²

First Production Stage

Limestone Factory

Area = 40,000 m² Production 3000 to 3600 m² / day = 990000 m² / year

Second Production Stage

Marble Factory

Extension with area 15,000 m² & production 1200 m²/ day Production 2000 to 2500 m² / day = 675000 m² / year

Third Production Stage

Granite Factory

Area = 22,000m² Production 2500 m² / day = 735000 m² / year

Fourth Production Stage

Quartzite Factory

Capabilities

13 Overhead Cranes

16 Heads Simec Italian Machine

4 Gang Saws

16 Heads Tiles Polishing Machine

6 Monofilos

Resin Line 80 Slabs Oven

9 Automatic Cutting Machines

Fifth Production Stage

11 Manual Cutting Machines

Final Production Stage

3 Tumbled Machines

CNC Router Machine

3 Slabs Polishing Lines

CNC Profiling Machine

3 Manual Polishing Machines

Slide 1

2 CNC Profiling Machines

Slide 1

3 CNC Routers (3 Axis)

Slide 1

CNC Router (4 Axis)

Slide 1

CNC Lathe Machine

Slide 1

Split Face Machine

Slide 1

Diamond wire saw Machine

Slide 1

Flaming Machine

Slide 1

Drilling Machine

Slide 1

Edge Polishing Machine

Slide 1

Resin Vertical Line

Slide 1

Tiles Polishing Line

Slide 1

Man Crafting

Slide 1